Found 85 results.
Bibliography
[1] The Reef Ball Foundation, “Oyster Reefs,” [Online]. Available: https://reefinnovations.com/services/ecosystem-restoration/oyster-reefs.
Possible Pilot: Pampanga River Outfall
To provide an example project/location, the Netherlands Enterprise Agency wants to plan for a pilot location to be developed.
Institutional
Section 6.5 and 6.6 describe long-term and short-term solutions for an institutional setup that allows for the execution of a pilot project and subsequent maintenance of the pilot project.
Layout
The current practice of constructing embankments involves lining relatively steep slopes with concrete for primary structures and for secondary structures such as fishponds they are constructed with bamboo poles with soil in between them.
Conceptual cost estimates
The following activities are foreseen to complete the construction of the outfall pilot
Institutional
If funded, the LGUs of Masantol and Macabebe are both open for implementing these solutions (if funded).
Conceptual cost estimates
The following activities are foreseen to complete the construction of the outfall pilot
Bibliography
[1] National Economic Development Authority, “Manila Bay Sustainable Development Master Plan: Action Plan + Investment Report,” 2021.
Local Rainfall
Road and riverbank elevation (to compensate for subsidence) without proper adjustments of the local drainage systems has led to water clogging in many places within the study area.
Welcome to the North Manila Bay Spatial Database!
Go to searchpage:
First Page Previous Page 3 4 5 6 7 (current page) 8 9 Next Page